Aluminum Die Casting NC Housing Auto Parts ADC12
Get Latest PricePayment Type: | T/T |
Incoterm: | FOB,CFR,CIF,FCA |
Min. Order: | 4000 Piece/Pieces |
Transportation: | Ocean,Land,Air |
Port: | NINGBO,SHANGHAI |
Payment Type: | T/T |
Incoterm: | FOB,CFR,CIF,FCA |
Min. Order: | 4000 Piece/Pieces |
Transportation: | Ocean,Land,Air |
Port: | NINGBO,SHANGHAI |
Model No.: L004200
Brand: NONE
Material: Aluminum
Deck: Double
Cavity Number: 1
Type: Power System
Die Casting Machine: Cold Chamber
Weight: 529g
Selling Units | : | Piece/Pieces |
Package Type | : | carton, PE pallet, PE flow box, steel box, wooden pallet, container |
The file is encrypted. Please fill in the following information to continue accessing it
Aluminum Die Casting NC Housing Auto Parts ADC12,
The material for this part is ADC12. During the Die Casting. Higher specific pressure is required, so that higher filling speed can be obtained.which is beneficial for alloy to overcome mold filling resistance.and effectively fill each part of the cavity.
Meanwhile, the speed of die casting is also very important.the ejection speed will affect the quality of Aluminum and steel alloy die casting housing.
The another key point of affecting the quality of Aluminum housing is the pouring temperature.
the temperature can not be too high or too low. both of them will cause the shrinkage.
The thinner the wall thickness is, the more complex the die casting is and the higher the mould temperature is, which is beneficial to the filling of the alloy liquid.
Material: ADC12
Cavity Number: 1
Process Technology: High pressure die casting, Cold Chamber
Product Dimensions: Customized
Casting General Tolerance: Grade GB-CT4
Surface Finish: Polishing
Flow Processes: Die casting, Degating to remove the residual of the gate, Polishing and Deburring to remove the burrs, Polishing to remove the parting line, flash,CNC Milling, Cleaning, Packaging, Storaging, Shipping
Control Measure: Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control
Inspection Equipment: CMM, Caliper, Plug Gage, Screw Gauge
Application: Auto Parts
Certificate: IATF16949:2016,ISO14001:2015,ISO45001:2018
Lead Time: 30-35 days
Trade Term: FOB Ningbo
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.