High precision CNC Mill end Housing
Get Latest PricePayment Type: | T/T |
Incoterm: | FOB,CFR,CIF,FCA |
Min. Order: | 4000 Piece/Pieces |
Transportation: | Ocean,Land,Air |
Port: | NINGBO,SHANGHAI |
Payment Type: | T/T |
Incoterm: | FOB,CFR,CIF,FCA |
Min. Order: | 4000 Piece/Pieces |
Transportation: | Ocean,Land,Air |
Port: | NINGBO,SHANGHAI |
Model No.: BL005
Brand: NONE
Type: Auto Fasteners
Material: Aluminum
Muffler Type: Center Muffler
Deck: Double
Surface Finish: Polishing
Weight: 200g-3000g
Cavity Number: 1
Machine: Cold Chamber
Selling Units | : | Piece/Pieces |
Package Type | : | carton, PE pallet, PE flow box, steel box, wooden pallet, container |
Download | : |
The file is encrypted. Please fill in the following information to continue accessing it
High precision CNC Maching Mill End Housing ,
this part is used as engine housing on the Agriculture facility, About this part. we should focus on following some quality problems.
Problem 1:Appearance cold shut.
if two alunimum alloy liquid flow together,they are not completely fused. The bonding force of alunimum alloy will be very weak, if the pouring temperature and mould temperature are low. should increase the temperature of pouring and mould. The flowability of alunimum alloy is poor, the runner location is not correct, the flow path is too long, and the filling speed is too low. The injection pressure should be increased, the rapid injection and pressurization should be increased, and the filling time should be shortened
Problem 2: Burrs
The reason is following:
The mould clamping force is not enough, the injection speed is too high, the pressure shock peak is too high, so it is necessary to adjust the appropriate Die Casting process. The sundries on the parting surface are not cleaned up, and the strength of the mould is not good,resulting in mold parting surface deformation
Material: A380
Cavity Number: 1
Process Technology: High pressure die casting, Cold Chamber
Product Dimensions: Customized
Casting General Tolerance: Grade GB-CT4
Surface Finish: Polishing
Flow Processes: Die casting, Degating to remove the residual of the gate, Polishing and Deburring to remove the burrs, Polishing to remove the parting line, flash,CNC Turning, Cleaning, Packaging, Storaging, Shipping
Control Measure: Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control
Inspection Equipment: CMM, Caliper, Plug Gage, Screw Gauge
Application: Machinery Parts
Certificate: IATF16949:2016,ISO14001:2015,ISO45001:2018
Lead Time: 30-35 days
Trade Term: FOB Ningbo
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.