Auto precision cnc Pump parts
Get Latest PricePayment Type: | T/T |
Incoterm: | FOB,CFR,CIF,FCA |
Min. Order: | 1500 Piece/Pieces |
Transportation: | Ocean,Land,Air |
Port: | NINGBO,SHANGHAI |
Payment Type: | T/T |
Incoterm: | FOB,CFR,CIF,FCA |
Min. Order: | 1500 Piece/Pieces |
Transportation: | Ocean,Land,Air |
Port: | NINGBO,SHANGHAI |
Model No.: BL003
Brand: NONE
Type: Windscreen Wiper System
Material: Aluminum
Muffler Type: Center Muffler
Deck: Single
Surface Finish: Electrophoresis Coating
Weight: 200g-3000g
Cavity Number: 1
Selling Units | : | Piece/Pieces |
Package Type | : | carton, PE pallet, PE pass gate, wooden pallet |
Download | : |
The file is encrypted. Please fill in the following information to continue accessing it
Auto Precision CNC Pump parts.
the material of this part is ADC-12, the part is a housing for Pump system which is used on car.
About Auto CNC Pump part .It is the irregular and complex . During the production. not only pay attention to the products' quality. Also should pay attention to staff training in the production process, they should following below steps
Step 1: fixing two side platen of fixed mould, then install two sides of the moving die platen.
Step 2: When the mold is in place, whether the Mold is locked or not, by adjusting the movement of the mold, the machine can adjust the mould properly so as to achieve the appropriate clamping force
Step 3: Attention must be paid to the core pulling before die clamping
Material: ADC-12
Cavity Number: 1
Process Technology: High pressure Die Casting, Cold Chamber
Product Dimensions: Customized
Casting General Tolerance: Grade GB-CT4
Surface Finish: Polishing, Nyloy polishing the second time
Flow Processes: Die casting, Degate, De-slag, Deburr to remove the flash around the ejector pins, Polishing to remove the parting line, Nyloy polish to make the part have more beautiful appearance,CNC Turning, Cleaning, Packaging, Inland Shipping to the port as the trad term is FOB NINGBO
Control Measure: Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control
Inspection Equipment: CMM, Caliper, Plug Gage, Screw Gauge
Application: Auto Parts
Certificate:IATF16949:2016,ISO14001:2015,ISO45001:2018
Lead Time: 30-35 days
Trade Term: FOB Ningbo
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.