OEM Aluminum Die Casting Wiper Connector
Get Latest PricePayment Type: | T/T |
Incoterm: | FOB,FCA |
Min. Order: | 1000 Piece/Pieces |
Transportation: | Ocean,Air |
Port: | NINGBO,SHANGHAI |
Payment Type: | T/T |
Incoterm: | FOB,FCA |
Min. Order: | 1000 Piece/Pieces |
Transportation: | Ocean,Air |
Port: | NINGBO,SHANGHAI |
Model No.: 111
Brand: NONE
Type: Exhaust System
Material: Aluminum
Muffler Type: Front Muffler
Deck: Double
Surface Finish: Shot Peening
Selling Units | : | Piece/Pieces |
Package Type | : | carton, pallet |
The file is encrypted. Please fill in the following information to continue accessing it
High Precision Customized connector parts is a part applied to Motor system, The part is auto part for famous motor corporation When produce this product,Shrinkage should be paid close attention to
Features: in the process of condensation, the shape of the die is irregular due to insufficient internal compensation, and the surface of the die is rough.
What's more, the part require surface finish of electrophoresis coating, for this technology, there is a process of curing at high temperature of 170-200 degree. so for the Die Casting work of this part, the QC should pay attention to fracturing the part to look into the section to see if the density is good or not, whether there is mass of small porosity inside of the part, whether the particle of the section looks good etc. or because of thermal expansion, the porosity will expand to the outer surface, leading to big problems of bubbles, pits, pinholes, cause big scrap because of cosmetic defects.
This part has a requirement of assembling a M6*1 nylon locking nut. The nut is for locking the mating plastic part.
Causes
1, alloy pouring temperature is too high.
2, the casting structure wall thickness is uneven, produce hot knot.
3, too low pressure.
4, overflow tank capacity is not enough, overflow is too thin.
5, the pressure chamber fullness is too small, surplus material (cake) is too thin, the final feeding can not play a role.
6, the gate is smaller.
7, the local temperature of the mold is high.
Exclusion measures
1. According to the alloy smelting standard, the overheating time of alloy liquid is too long, and the pouring temperature is lowered.
2, improve the casting structure, eliminate metal accumulation parts, uniform wall thickness, slow transition.
3, appropriately increase the specific pressure.
4, increase the overflow tank capacity, thickening overflow mouth.
5, increase the pressure chamber fullness, adopt quantitative pouring.
6, appropriately improve the gating system to transfer the pressure well.
Material: ADC-12
Cavity Number: 2
Process Technology: High pressure die casting, Cold Chamber
Product Dimensions: Customized
Casting General Tolerance: Grade GB-CT4
Surface Finish: Polishing, Vibratory Deburring
Flow Processes: Die casting, Degating, Deburring to remove the flash around the ejector pins, Polishing to remove the parting line, Vibratory Deburring to make the part more consistency, High Precision CNC Lathe Machining, E-coating, Cleaning, Packaging, Shipping
Control Measure: Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control
Inspection Equipment: CMM, Caliper, Plug Gage, Screw Gauge
Application: Auto Parts
Certificate: ISO/TS16949:2009
Lead Time: 30-35 days
Trade Term: FOB Ningbo
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.